James chose to do his Eagle Project for My Father's House (a Family Shelter). He decided to fix-up the Playground area for the Shelter. There was no Sidewalk to the Playground from the Patio area & the wooden Play Structure & Benches were in desperate need of a new coating of stain (or sealer).
James decided to do the following:
- Install a 5' x 10' rebar reinforced Concrete Sidewalk to the Playground
- Re-stain (seal) the wooden Play Structure & nearby Benches
- Use the Sidewalk (& rebar) to reinforce (secure) the loose Gate Post that was very wobbly
His Project worked well & was very much appreciated.