.
Ryan chose to work with Bridge House (at Bridge City Community Church) for his project. There were 2 specific safety hazards that he wanted to address.
First, there was a parking lot curb area that was a trip hazard between the wheelchair ramp in the sidewalk & the parking lot. Ryan planned, built, & installed a pipe handrail just behind the curb. It was painted a high-visibility yellow color so that everyone would notice it without running into it.